top of page
Acerca de
Lot 1847, Pye Rd
Waitsia-03 gas well
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites.
The proposal includes clearing of up to 17 ha of native vegetation to support the following:
Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day;
Drilling of up to 6 new production wells to supplement the existing 2 wells;
Installation of a gas gathering system comprising of flowlines and hubs; and
Installation of a flowline from the proposed gas plant for water reinjection via a disused petroleum production well.
bottom of page